Skip to main content
PanelSpec

200A Panel + Detached Garage Workshop Subpanel (150 ft Run)

Combines dwelling service headroom with a detached workshop subpanel feeding woodworking tools and EV charging over a 150-foot trench run.

400A & Subpanels PASS (Within Capacity)

Calculated NEC 220.82 Summary

240V Split-Phase Dwelling
Total Demand
138.2 A
33,160 VA
Service Rating
200 A
69.1% used
Headroom
+61.8 A
Min 150A
EVSE Demand
9,600 VA
NEC 2023 220.57
Line Item Code Basis Factor Net VA
General Lighting & Receptacles (2,100 sq ft × 3 VA) NEC 220.82(B)(1) General Pool 6,300
Small Appliance (2 × 1,500 VA) + Laundry (1 × 1,500 VA) NEC 220.82(B)(2) General Pool 4,500
Fixed & Fastened Appliances (Range, Dryer, Water Heater, Kitchen, Pool) NEC 220.82(B)(3) General Pool 22,600
General Pool Demand (First 10 kVA @ 100% + Remainder @ 40%) NEC 220.82(B) 100% / 40% 19,360
Central A/C Cooling (Gas/Fuel Heat) NEC 220.82(C) 100% Largest HVAC 4,200
Level 2 EV Charger (40A @ 240V) NEC 2023 220.57 100% Nameplate 9,600
Total Calculated Service Load 138.2 A 33,160 VA

Profile Specifications & Key Findings

Typical Dwelling: 2,100 sq ft home + detached garage workshop with 240V shop equipment & 40A EVSE

Recommended Hardware Pathway: 100A garage subpanel with 1 AWG Cu or 1/0–2/0 AWG Al feeder upsized for <3% voltage drop at 150 ft

Conductor Sizing Note: At 150 ft one-way, an 80A load on 2 AWG Al drops 3.82 V (1.59%) at 240V, while 120V circuits drop 3.18% unless neutral-balanced.

  • Trench length matters most for 120V shop receptacles and high-inrush table saws/compressors: 100 ft+ runs benefit from upsizing aluminum feeders one gauge.
  • On a 200A home with gas heat, adding 6,000 VA of shop circuits plus a 40A EVSE leaves comfortable headroom (~48 A remaining).
  • Always keep neutral and ground isolated in the garage subpanel and drive local ground rods per NEC 250.32.

Balancing Shop Equipment Diversity With EV Charging

Home woodshops and garages often list dozens of amps of motor nameplate ratings (table saw, planer, dust collector, welder) that only run one or two machines at a time. Including a realistic 6,000 VA continuous shop allowance in the main panel calculation alongside a 40A EVSE totals roughly 149 A on a 200A service.

Subpanel Feeder Voltage Drop Over Long Runs

Because aluminum XHHW-2 or SER/USE-2 cable is inexpensive per foot compared to copper, upsizing a 150-foot trench feeder from 2 AWG Al to 1/0 AWG Al or 2/0 AWG Al reduces voltage sag during motor startup for very little extra material cost.

Compare Related Scenarios